Закрыт

Mineral Processing Pre-Feasibility Study (Iron/Aluminium)

Job Description:

We’re anticipating the Viability Study will be a high-level study of a mineral processing zone (MPZ) in the Republic of Congo (ROC) over a few months seeking to:

• Ascertain whether it is better to establish the proposed iron-ore MPZ, primarily pig iron plant at the mine, or 400km away at the deep-water port at Pointe-Noire

• Can the MPZ be serviced with sufficient infrastructure at the mine?

• ROM of capex and opex for MPZ (note, 2 nearby hydro schemes are about to commence construction totalling 300MW that could be partially harnessed to power the MPZ)

• ROM of capex and opex for MPZ at Pointe-Noire, adjacent to the port. Power supply here would be derived from gas, albeit, development of the ROC’s significant proven gas reserves is very much in its infancy

• ROM of capex and opex for an aluminium smelter or integrated smelter/refinery MPZ at Pointe-Noire

• High-level technical and commercial assessment as to whether any one or more of the MPZ options are potentially viable.

If there is potential viability, then the final step would be to outline the Terms of Reference for a Pre-Feasibility Study for the relevant MPZ development(s).

Background:

Rather than starting with a PFS from the get-go, we recommend we do a viability assessment first, to see whether it is worth considering such developments. We are broadly defining the study / design gateways as:

Viability Study

• Primary focus: Why consider the development?

• Vision planning of broad options

• Rough order of magnitude (ROM) costs +100%/-50%

Pre-Feasibility Study

• Primary focus: What is the development?

• Master planning resolution of 1 or 2 preferred options

• CAPEX +/-50% and indicative OPEX

Bankable Feasibility Study

• Primary focus: How to implement development?

Concept design

• CAPEX / OPEX +/-30%

FEED / Preliminary Design

• CAPEX / OPEX +/-20%

EPIC / Detailed Design

• CAPEX / OPEX +/-10%

Навыки: Техника, Process Engineering, Горное дело, Промышленная инженерия

О клиенте:
( 0 отзыв(-а, -ов) ) Abu Dhabi, United Arab Emirates

ID проекта: #35326064

5 фрилансеров(-а) готовы выполнить эту работу в среднем за $34700

YehudisG

Hi, I am a mining and mineral processing expert, working with various metals in research and plant construction. In formal education, I have my Master's degree in Chemical Environmental engineering from Columbia Unive Больше

$50000 USD за 90 дней(-я)
(3 отзывов(-а))
4.3
fayyazs789

Hi there

$28500 USD за 7 дней(-я)
(1 отзыв)
2.3
rijutapatidar

Hi, Hope you are doing well. We are much expertise group of iOS, Android, Website developers and Designers Please review my profile - https://www.freelancer.in/u/rijutapatidar I understood the initial scope of Mineral Больше

$35000 USD за 70 дней(-я)
(0 отзывов(-а))
0.0